5.2 Update Sales Order Status to enable Delivery: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 21: | Line 21: | ||
[[File:OD.png]] | [[File:OD.png]] | ||
{{ | {{Tip}} This is the latest stage where the material lines have to be added; these action can | ||
be avoided either at the Inquiry and the Quotation stage (e.g. in case of cargo composition not well defined by the Partner). In case of partial shipments (e.g. cargoes shipped in multiples rotations), the material lines might be added (or modified) in the SO to comply with cargoes compositions. In this case, the line items for the materials have to be inserted in groups to reflect the final compositions, so that the system will derive the required lines per ea of the cargoes/departures. | be avoided either at the Inquiry and the Quotation stage (e.g. in case of cargo composition not well defined by the Partner). In case of partial shipments (e.g. cargoes shipped in multiples rotations), the material lines might be added (or modified) in the SO to comply with cargoes compositions. In this case, the line items for the materials have to be inserted in groups to reflect the final compositions, so that the system will derive the required lines per ea of the cargoes/departures. |
Latest revision as of 21:05, 2 February 2014
Update Sales Order Status to enable Delivery | |
Performer: | Logistics |
Role: | Logistics Assistant |
Transaction : | WingsII – VA02 |
Open the Sales Order that was provided by Customer Services:
Set the Delivery block field (usually from ‘Waiting for Approval’) to ‘blank’:
Hint: This is the latest stage where the material lines have to be added; these action can be avoided either at the Inquiry and the Quotation stage (e.g. in case of cargo composition not well defined by the Partner). In case of partial shipments (e.g. cargoes shipped in multiples rotations), the material lines might be added (or modified) in the SO to comply with cargoes compositions. In this case, the line items for the materials have to be inserted in groups to reflect the final compositions, so that the system will derive the required lines per ea of the cargoes/departures.