5.2 Update Sales Order Status to enable Delivery: Difference between revisions

From UNHRD Customer Service Sales
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 21: Line 21:
[[File:OD.png]]
[[File:OD.png]]


{{TIP}} This is the latest stage where the material lines have to be added; these action can  
{{Tip}} This is the latest stage where the material lines have to be added; these action can  
be avoided either at the Inquiry and the Quotation stage (e.g. in case of cargo composition not well defined by the Partner). In case of partial shipments (e.g. cargoes shipped in multiples rotations), the material lines might be added (or modified) in the SO to comply with cargoes compositions. In this case, the line items for the materials have to be inserted in groups to reflect the final compositions, so that the system will derive the required lines per ea of the cargoes/departures.
be avoided either at the Inquiry and the Quotation stage (e.g. in case of cargo composition not well defined by the Partner). In case of partial shipments (e.g. cargoes shipped in multiples rotations), the material lines might be added (or modified) in the SO to comply with cargoes compositions. In this case, the line items for the materials have to be inserted in groups to reflect the final compositions, so that the system will derive the required lines per ea of the cargoes/departures.

Latest revision as of 21:05, 2 February 2014

Update Sales Order Status to enable Delivery
Performer: Logistics
Role: Logistics Assistant
Transaction : WingsII – VA02

Open the Sales Order that was provided by Customer Services:

Set the Delivery block field (usually from ‘Waiting for Approval’) to ‘blank’:

Note Hint: This is the latest stage where the material lines have to be added; these action can be avoided either at the Inquiry and the Quotation stage (e.g. in case of cargo composition not well defined by the Partner). In case of partial shipments (e.g. cargoes shipped in multiples rotations), the material lines might be added (or modified) in the SO to comply with cargoes compositions. In this case, the line items for the materials have to be inserted in groups to reflect the final compositions, so that the system will derive the required lines per ea of the cargoes/departures.